Betrawati, Nuwakot : Repair of the power house of the Trishuli Hydropower Centre destroyed in a fire has started.
An 18-member team of technicians and officials from the centre has been assigned to repair the house, said the centre chief Taradatta Bhatta, adding that it will take at least a week to complete the repair. “Repair is expedited by dividing the team into two groups.”
The 14-Megawatt Devighat Hydropower Centre and the 21-Megawatt centre came to a halt after the fire destroyed the power house on Wednesday evening. RSS